imagineering-engineering
Blog Chaging the future one bolt at a time
Showing posts with label
Stove part three
.
Show all posts
Showing posts with label
Stove part three
.
Show all posts
Friday, November 13, 2009
Stove part three
The hinges have been welded and the door latch made and put on.The final cut is done around the door opening and the door opens freely without binding.
Older Posts
Home
Subscribe to:
Posts (Atom)